{"id":877,"date":"2019-02-06T14:53:21","date_gmt":"2019-02-06T14:53:21","guid":{"rendered":"http:\/\/www.stratfordengineers.com\/2019\/?post_type=project&#038;p=877"},"modified":"2020-12-08T17:52:53","modified_gmt":"2020-12-08T17:52:53","slug":"236-east-85th-street","status":"publish","type":"project","link":"https:\/\/www.stratfordengineers.com\/2019\/project\/236-east-85th-street\/","title":{"rendered":"236 EAST 85TH STREET"},"content":{"rendered":"<div id=\"pl-877\"  class=\"panel-layout\" ><div id=\"pg-877-0\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-877-0-0\"  class=\"panel-grid-cell\" ><div id=\"panel-877-0-0-0\" class=\"so-panel widget widget_sow-headline panel-first-child panel-last-child\" data-index=\"0\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-headline so-widget-sow-headline-default-d595cf335cd9-877 so-widget-fittext-wrapper\"\n\t\t\t data-fit-text-compressor=\"0.85\"\n\t\t><div class=\"sow-headline-container \">\n\t\t\t\t\t\t\t<h1 class=\"sow-headline\">\n\t\t\t\t\t\t236 EAST 85TH STREET - NEW YORK, NY\t\t\t\t\t\t<\/h1>\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"decoration\">\n\t\t\t\t\t\t<div class=\"decoration-inside\"><\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n<\/div><\/div><\/div><\/div><div id=\"pg-877-1\"  class=\"panel-grid panel-no-style\" ><div id=\"pgc-877-1-0\"  class=\"panel-grid-cell\" ><div id=\"panel-877-1-0-0\" class=\"so-panel widget widget_sow-editor panel-first-child panel-last-child\" data-index=\"1\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h5>Location:<\/h5>\n<p>Manhattan, NY<\/p>\n<h5>Architect:<\/h5>\n<p>FreemanWhite, Inc.<br \/>\n<a href=\"http:\/\/www.freemanwhite.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">www.freemanwhite.com\/<\/a><\/p>\n<h5>Size:<\/h5>\n<p>50,000 square feet<\/p>\n<h5>Description:<\/h5>\n<p>An existing six-story parking facility in the Upper East Side, Manhattan, is being converted into medical offices for Mount Sinai. Stratford Engineering has designed steel framing in order to reinforce the existing structure for the building\u2019s new purpose. Existing car elevator shafts at the building\u2019s perimeter were infilled to create new floor space with street facing windows. A new centrally located elevator core was designed to allow for the installation of three new passenger elevators to serve the building\u2019s new use. Additional improvements to the building include:<\/p>\n<ul>\n<li>New rooftop mechanical equipment<\/li>\n<li>New water tower supported above new elevator shaft<\/li>\n<li>New slab at cellar level<\/li>\n<\/ul>\n<\/div>\n<\/div><\/div><\/div><div id=\"pgc-877-1-1\"  class=\"panel-grid-cell\" ><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Location: Manhattan, NY Architect: FreemanWhite, Inc. www.freemanwhite.com\/ Size: 50,000 square feet Description: An existing six-story parking facility in the Upper East Side, Manhattan, is being converted into medical offices for Mount Sinai. Stratford Engineering has designed steel framing in order to reinforce the existing structure for the building\u2019s new purpose. Existing car elevator shafts atContinue reading &rarr;<\/p>\n","protected":false},"author":1,"featured_media":887,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"project_type":[4],"class_list":["post-877","project","type-project","status-publish","has-post-thumbnail","hentry","project_type-healthcare","has-thumb"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.stratfordengineers.com\/2019\/wp-json\/wp\/v2\/project\/877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.stratfordengineers.com\/2019\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.stratfordengineers.com\/2019\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/www.stratfordengineers.com\/2019\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.stratfordengineers.com\/2019\/wp-json\/wp\/v2\/comments?post=877"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.stratfordengineers.com\/2019\/wp-json\/wp\/v2\/media\/887"}],"wp:attachment":[{"href":"https:\/\/www.stratfordengineers.com\/2019\/wp-json\/wp\/v2\/media?parent=877"}],"wp:term":[{"taxonomy":"project_type","embeddable":true,"href":"https:\/\/www.stratfordengineers.com\/2019\/wp-json\/wp\/v2\/project_type?post=877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}